Technology Principal
I first became aware of 71000 Duke of Gloucester through an article in PECO Publications Railway Modeller, which I avidly read during my teenage years. Even then, the locomotive stood out — described by some as a unique mainline marvel, and by others as a mis-assembled monster.
Built in 1954 as a one-off prototype during the final years of British steam, The Duke was introduced at pace and never fully realised its intended performance in service. Design compromises and construction issues meant it developed a reputation as a poor steamer, and it was withdrawn before those problems could be properly addressed.
That story — of a locomotive with untapped potential — was what always fascinated me.
Through my engineering apprenticeship and long-standing interest in model railways, I have spent years recreating The Duke in miniature across a number of scales, from OO through to Gauge 1. However, the opportunity to become involved with the full-size locomotive was something entirely different, and one I could not resist.
Today, I support the Trust in keeping this remarkable machine operating on both mainline and preserved railways. Thanks to the work of the preservation team, the locomotive has been extensively re-engineered, correcting many of the original design limitations and allowing it to perform as it was always intended.
Alongside this, I am leading the modernisation of the Trust’s operational systems. This includes the introduction of integrated digital platforms spanning membership, communications, and financial management. By connecting these systems, the Trust is improving its ability to forecast income, plan future overhaul and operating costs, and ensure the long-term sustainability of 71000.
This work is focused on bringing greater structure, visibility, and resilience to the organisation — helping to ensure that The Duke continues to run on the mainline for future generations to experience and enjoy.