Working Party 2/11/2019

Working Party 2/11/2019

Attendees: 8

Team Leader: Dave Oliver

 

  1. The boiler was all cleaned off and a second coat of VHT paint applied to approx. half of it.
  2. The RH Caprotti drive shaft is now back with the loco, it has been paint stripped and now ready for undercoating, a good start was made stripping the paint from the LH shaft.
  3. The new driving wheel bearings are now on site, space has been made to store these until required.
  4. There is a problem with the 24v electrics on the support coach – this was investigated, also the water system has been drained for the winter.

 

Michael was on site taking photos.

November, team leader John Attridge.

 