Working Party 19/10/2019

Working Party 19/10/2019

Attendees: 5

Team Leader: John Attridge

 

  1. Work was carried out on the coach outer body repair patches
  2. The final outer bearings were withdrawn. A very large castellated nut had to be removed first to enable the tender bearings to be removed off the axles.  It was decided that it would require a large specialist spanner to do this as we felt it was not good engineering practice to undo the nut with a sledge hammer and chisel. After some discussion Dave  had a eureka moment and produced the spanner shown in the attachments. The spanner made short work of the obstinate nuts.

 

Next working day: 2nd November, team leader Dave Oliver.

 

 